CLT

Take a look at the latest news and blogs from the STA

05.12.23

Fire Mitigation Product Paper 1 – Flame retardant and intumescent coatings for FR Build compliance

05.12.23

Design guide to separating distances during construction, Part 4 (For CLT type frame buildings)

05.12.23

Building Low Carbon Homes – Guide 4

05.12.23

Advice Note 09 – Part 2 – CDM Regulations for Domestic Clients

05.12.23

Advice Note 09 – Part 1 – CDM Regulations for STA Members

05.12.23

Advice Note 08 – Part 1 – Thermal imaging cameras

05.12.23

Technical Bulletin 08 – Glued laminated timber structures

05.12.23

Advice Note 07 – Part 5 – Design of escape routes during the construction process

05.12.23

Advice Note 07 – part 5- Fire robustness Escape routes during construction

05.12.23

Advice Note 06 – Part 1 – Thermal performance – Fabric first approach to thermal performance

05.12.23

Advice Note 05 – Part 2 – Timber Floor Structures

05.12.23

Advice Note 05 – Part 1 – Podium support structures